Concrete pump boom and crawler crane over a wall pour, with operatives working from the top of the wall formwork.

Precision formwork. Built right.

A specialist formwork contractor working across the commercial construction sector — providing labour, materials and complete formwork packages.

  • Traditional & system formwork
  • East Midlands — working UK wide
  • Commercial & selected residential
8+

Years of industry experience on and managing formwork packages

3countries

Experience gained across the UK, Australia and New Zealand

11services

From ground beams and slabs to radial formwork and stairs

4values

Quality, reliability, safety and perseverance on every pour

JG Specialist Formwork

JG Formwork is a specialist formwork contractor providing professional formwork solutions across the commercial construction sector, with a willingness to undertake selected residential projects.

We provide labour, materials and complete formwork packages, allowing us to work flexibly with clients and main contractors to meet the individual requirements of each project.

From straightforward structures to more complex and detailed formwork, we approach every project with the same level of care, precision and commitment.

Reinforcement cage fixed around a stormwater pit ahead of the wall pour.

What we do

A full range of traditional and system formwork.

Whether you need us to supply labour only, labour and materials, or take on the complete formwork package, the scope below is what we set out, pour and strike.

In-situ concrete walls

Wall forms set out, aligned and propped to line and level, using traditional or panel systems to suit the pour.

Concrete slabs

Ground-bearing and suspended slabs, including edge shuttering, kickers and construction joints.

Ground beams

Beam shuttering set out to line, braced against the pour and struck ready for following trades.

Radial formwork

Curved and circular forms built to radius — plinths, tanks, chambers and radiused walls.

Concrete frames

Frame formwork sequenced around the reinforcement programme and the wider construction sequence.

Columns

Square, rectangular and circular column forms, plumbed, clamped and braced before the pour.

Service pits

Pits, chambers and sumps, including formed penetrations and blockouts cast in on the first pour.

Swimming pools

Pool shells and surrounds formed in-situ to the required profile and finish.

Concrete stairs

Flights, landings and soffits formed to the designed rise and going, with clean arrises on strike.

Traditional formwork

Timber and ply forms built on site — the answer for one-off geometry and detail that panels can't make.

System formwork

Proprietary panel systems ganged, aligned, propped and struck to keep the programme moving.

Something else?

If the formwork you need isn't on this list, it's still worth asking — most of it is a variation on the above.

Ask us

Not sure which package suits? We work flexibly — labour only alongside your own kit, labour and materials, or the complete formwork package from set-out to strike.

Recent work

Formwork on the ground, not in a brochure.

Three recent packages — core and climbing formwork, UK water infrastructure, and Australian defence infrastructure. Select any image to view it full size.

  • Water treatment
  • Defence & airfield infrastructure
  • Commercial construction
  • Selected residential

Project 01

Core walls and climbing formwork

Vertical lifts to an in-situ concrete core. Bracket-mounted working platforms and soffit tables climb with the structure, carried on cone anchors cast into the lift below. Wall panels are set, plumbed and tied off the platform, with starter bars left projecting for the lift above.

Scope
Core walls, wall panels, soffit tables
System
Climbing bracket formwork

Project 02

Radial plinths, MCC slab and pit walls

Circular plinths formed to radius in traditional timber, braced and poured alongside a motor control centre base slab and in-situ pit walls. The plinths were struck to a clean, uniform as-struck finish with a consistent arris around the full circumference.

Sector
Water treatment
Location
Worcestershire, UK
Scope
Radial formwork, slab, pit walls

Project 03

Stormwater pit structures, airfield infrastructure

In-situ reinforced concrete stormwater pits formed on a live airbase, using ganged system panels and traditional forms. Circular pipe penetrations and blockouts were set true and cast in on the first pour, with lid slabs formed off a propped deck and headwall runs carried across the airfield works.

Sector
Defence infrastructure
Location
Northern Territory, Australia
Scope
Service pits, walls, lid slabs, ground beams

Meeting deadlines

Formwork sets the pace of the whole programme.

We understand that formwork is an important part of the overall construction programme. Delays can affect multiple trades and the progress of an entire project.

Our aim is therefore to deliver our work efficiently, safely and to programme, while maintaining the quality expected from a specialist formwork contractor.

Looking up an in-situ concrete core with climbing formwork brackets, soffit tables and wall panels set for the next lift.

Our experience

Eight years, three countries, one standard.

With 8 years of industry experience, we have worked on and managed projects across the UK, Australia and New Zealand, giving us valuable experience across a wide range of construction environments and formwork requirements.

That has allowed us to develop a strong understanding of different construction methods, working environments and project requirements. Having both worked on and managed projects, we understand the importance of planning, coordination and maintaining a high standard of workmanship throughout every stage of construction.

  • Projects delivered across the UK, Australia and New Zealand
  • Experience both on the tools and managing formwork packages
  • Commercial construction, plus selected residential projects
  • Labour only, labour and materials, or the complete package

Our values

Four things every project gets.

Whatever the size of the package, the way we work doesn't change.

01

Quality

We take pride in our workmanship and aim to deliver every project to a high standard, with attention to detail throughout the formwork process.

02

Reliability

We understand the importance of being a contractor that clients and main contractors can rely on. We work professionally and communicate throughout the project to keep work progressing efficiently.

03

Safety

Safety is fundamental to everything we do. We aim to maintain safe working practices and ensure our work is carried out responsibly and professionally.

04

Perseverance

Construction projects can present challenges. We approach problems positively, work to find practical solutions and remain committed to delivering the required result.

Get in touch

Got a pour in the programme?

Send over the drawings, the programme dates or just a rough idea of the scope — whether you need labour, materials or the complete formwork package.